Advent Design’s client had to build
and ship four Cell Analysis systems, and two spare control
cabinets, in an eight-month period of time. Advent Design
began the project by organizing all of the engineering documentation
developed by the client into a set of assembly documents.
Advent organized the bill of materials, procured all of
the necessary components, assembled and wired each machine,
and performed final product testing.
Each machine consisted of two major components;
a workbench, and a 19” rack based control cabinet.
|